1 Technical description
a)
COQUIMBO's WHARF COQUIMBO's BAY.
b)
Port for major ships , concrete malecòn of 378mtrs
long with capacity to recibe two ships depending on
the respective lengths.
c)
WHARF LOCATION:
LATITUDE
: 29° 57 00 S.
LONGITUDE : 071° 20 00 W.
d)
OPERATOR OWNER:
CoquimboPort Enterprise (COPE).
2.
Places for approaching land.
a)
Maxime lenght per site : 220,00 meters.
b)
Máxima total front leght on both sites : 260,00
metros.
c)
Orientation : to 011°.
d)
Maxime space : Place N° 1 : 9,26 meters.:
Place N° 2 : 9,37 meters.
e)
T.R.G. : Depending on maxime space.
f)
Particular Conditions of place operation : None.
3.
Specific conditions of operation in
the port or in the terminal.
a)
Approaching land, departure, fond: Normal time for the
maneuver 1 hour, obligatory use trailer and practice,
the maneuvers can be done during day and nigth. For
the tighting and untighting maneuvers, 1 bote for tighten
will de useful in case of transference support.
b)For
minor ships of 180,000meters of eslore must operate
with 1 trailer of 1.500HP
of minimum power.
c)
For mayor ships of 180,00meters of eslore must operate
with 1 trailer of 2.500HP of minimum power.
d)
Approachung land bands : Starboard, until the neccesary
file lines are ready and authorized to arrive in the
band of port.
e)
Simultaneos maneuvers for on boarding: limited for trailer
use.
f)
Maneuvers of lining : not allowed in the port.
g)
The ship must have 2 anchors on opèrative conditions
with 10 tray of chains each one. It required a proa
6 manila spy or nylon of 200 meters each fonded with
prow to the south. The diameter or the spy menas must
be in order to the ship size.
h)
The ships must consider the scale cat intallation for
practices, and a real scale(in perfect combination with
the cat)for authorities , both are install for the sotavento
band on and in good shape.
i)
The people in charge recibing and sending spy must do
this proving it before to use good shape safe wear.
j)
The botes operating for transference of practices or
support on tighten work must have a VHF comunication
equipment with 06,08,12,14 and 16 channels.
k)
While the fuel transport works are done or dangerous
stuff ,it will be strictly prohibited work on hot temperatures.
l)
Every relative dispositions must be applied to prevent
the contamination of the sea enviroment, in order to
Ruling for Control the Acuatic Contamination., and all
legal bodies.
4.
Operation Limits.
a)
Daily and nigth maneuvers:24 hours. For nigth maneuvers
all the line files must be on operation.
b)
Maxime wind power allowed: Not more than 0,7meters per
second (13,6 nudes).
c)
Current limitations: Not more than 0,5 nudes.
d)
Rain limitations:depending on the load type.
e)
swell limitations: sin marejadas ni resaca.
e)
Visuality limitations: over 1,3 nautic miles.
f)
Operation procedures agaisnt vary climate conditions:
The agency must be informed and practical , target let
the ship out.
g)
Operation procedures against bad weather: create space
and fond the trip.
h)
Operation procedures agaisnt tempest conditions: create
space and fond the trip.